Support
Consumables & spares
The machine is bought once; the consumables keep it running. Original parts, shipped from Guangzhou on a repeat schedule.
Intervals
What wears out, and roughly when
Indicative figures under normal duty. A shop welding eight hours a day consumes lenses far faster than one welding two hours a week — treat these as planning numbers and inspect in between.
| Consumable | Typical interval | What to know |
|---|---|---|
| Protective lens (focus lens window) | Inspect daily; replace when spatter-damaged | Under normal duty a lens lasts around three months. Heavy spatter or a dirty gas line shortens that sharply — this is the part that protects a much more expensive optic behind it. |
| Copper nozzle / focusing nozzle | Around six months | Wear shows up as an unstable bead and gas coverage problems before it shows up visually. Keep one spare on the shelf. |
| Filler wire | Consumable per metre welded | Correct diameter and alloy for the base material. Copper filler wire is not supported on this platform. |
| Shielding gas | Roughly weekly in continuous use | Argon or argon mix depending on material. Cylinder exchange is local; we advise on the regulator and flow setting. |
| Cooling water (water-cooled models) | Check level weekly; change per schedule | Use purified or deionised water as specified — tap water scales the chiller and the repair costs more than the water ever will. |
Do not run a lens until it fails. A damaged protective lens is cheap; the optic behind it is not. Keep one spare on the shelf.
What we stock
Original parts, no substitutes

Protective lens (focus lens window)
Inspect daily; replace when spatter-damaged
Under normal duty a lens lasts around three months. Heavy spatter or a dirty gas line shortens that sharply — this is the part that protects a much more expensive optic behind it.

Copper nozzle / focusing nozzle
Around six months
Wear shows up as an unstable bead and gas coverage problems before it shows up visually. Keep one spare on the shelf.

Filler wire
Consumable per metre welded
Correct diameter and alloy for the base material. Copper filler wire is not supported on this platform.

Shielding gas
Roughly weekly in continuous use
Argon or argon mix depending on material. Cylinder exchange is local; we advise on the regulator and flow setting.

Cooling water (water-cooled models)
Check level weekly; change per schedule
Use purified or deionised water as specified — tap water scales the chiller and the repair costs more than the water ever will.
Order consumables on WhatsApp